Powered By Kitlog Pro v2.0
RV10 I-CAVS
RV10
All
2-8-2020
< Previous Log Entry
Next Log Entry >
Date:
2-8-2020
Number of Hours:
0.50
Manual Reference:
10-9 step 1-2
Brief Description:
TAILCONE Bellcrank ribs matchdrilling
Assembly of the F-1006 Bulkhead to the left and right skins and to the bellcrank ribs.Final drill all holes with #30 drill bit.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
184
422
Empennage
150
353
Fuselage
33
61
Miscellaneous
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.