KitLog pro

Powered By Kitlog Pro v2.0

RV10 I-CAVS
' style=
Date:  2-8-2020
Number of Hours:  5.00
Manual Reference:  10-8 step 1-7
Brief Description:  TAILCONE F-1012AB final assembly

Assembled and clecoed all the part of the tail.
Matchdrilled F-1047C-D-E both on the right and the left side carefully checking alignemnt on each hole.
Positioned Stiffeners F-1055L&R, matchdrilled.
Fabricated rudder stop brace (Lucio)

Together with Lucio we checked allignement and level of the tailcone with extremely good results.
Rudder Stop Brace matchdrilled AFTER Checking that the tailcone is not twisted (previous step).
Cross check after matchdrilling confirms alignement is good.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.