Powered By Kitlog Pro v2.0
RV10 I-CAVS
RV10
All
3-12-2020
< Previous Log Entry
Next Log Entry >
Date:
3-12-2020
Number of Hours:
0.75
Manual Reference:
8-2 step 6
Brief Description:
HS Rivet HS-912 hinge brackets
Final drilled all Hinge Brackets with #30 drill bit.
Countersunk holes as indicated in order to rivet with AN4264-6 and to accomodate the bearing assembly.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
184
422
Empennage
150
353
Fuselage
33
61
Miscellaneous
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.