KitLog pro

Powered By Kitlog Pro v2.0

RV10 I-CAVS
' style=
Date:  10-25-2019
Number of Hours:  1.00
Manual Reference:  8-5 step 6-7
Brief Description:  HS Countersink front spar doubler and final drill

Countersink identified 1/8" holes on the Front Spar Doubler for 1/8" flush rivets.

Final drill the middle 9 holes in bot flanges with #40 drill, then machine countersink for 3/32" rivets.Same procedure on the other flange.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.