Powered By Kitlog Pro v2.0
RV10 I-CAVS
RV10
All
10-24-2019
< Previous Log Entry
Next Log Entry >
Date:
10-24-2019
Number of Hours:
2.00
Manual Reference:
8-3 step 3
Brief Description:
HS Elevator attachment bracket fabrication
cut from AA6-187X2X2-1/2 angle two parts
Drilled 1/8" hole in the indicated position.
Trimmed to measure.
Drilled 3/16" holes
Radius all corners 1/8".
After mounting and matchdrilling the holes are right at the limit to the edge.
After consultation with Lucio Castrogiovanni it seems that the fabrication is acceptable.
As i ordered other angles from VANS i consider to refabricate the brackets.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
184
422
Empennage
150
353
Fuselage
33
61
Miscellaneous
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.