Powered By Kitlog Pro v2.0
RV10 I-CAVS
RV10
All
10-19-2019
< Previous Log Entry
Next Log Entry >
Date:
10-19-2019
Number of Hours:
0.50
Manual Reference:
8-3 step 1
Brief Description:
HS inboard hinge bracket
final drill the six holes of the two flanges with #30 drill. final drill the 3/16" with #12 drill.
Scuffed all the parts.
Clamped to a flat and riveted with 1/8" rivets
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
184
422
Empennage
150
353
Fuselage
33
61
Miscellaneous
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.