Powered By Kitlog Pro v2.0
RV10 I-CAVS
RV10
All
9-25-2019
< Previous Log Entry
Next Log Entry >
Date:
9-25-2019
Number of Hours:
2.00
Manual Reference:
7-B (11) step 2
Brief Description:
RUDDER Leading Edge
rolled a 1-1/4" pipe to the skins and slowly rolled to shape.
Riveted with blind rivet as indicated
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV10 Home
Category
# Logs
# Hours
All
184
422
Empennage
150
353
Fuselage
33
61
Miscellaneous
1
8
Copyright © 2001-2024 Matronics. All Rights Reserved.