Powered By Kitlog Pro v2.0
Gregs RV-7A Site
RV-7a
Empennage
1-21-2011
< Previous Log Entry
Next Log Entry >
Date:
1-21-2011
Number of Hours:
4.00
Manual Reference:
Brief Description:
VS - Assembled and riveted VS.
Finished riveting the vertical stabilizer. For some reason I was having trouble riveting. I thought I had the hang of it after the HS, but I kept messing up and had to drill out more rivets then I would have liked. On to the rudder.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7a Home
Category
# Logs
# Hours
All
137
1176
Empennage
31
134
Engine
1
1
Finish Kit
5
30
Fuselage
49
645
Miscellaneous
2
8
Wings
49
358
Copyright © 2001-2024 Matronics. All Rights Reserved.