Powered By Kitlog Pro v2.0
GARY'S WEB SITE
CH750
All
6-21-2012
< Previous Log Entry
Next Log Entry >
Date:
6-21-2012
Number of Hours:
1.25
Manual Reference:
Brief Description:
Elevator skeleton assembly.
Layed out rib location on elevator spar.
Marked center line on ribs 9mm frrom edge.
Layed out rivet location for rear and noes ribs.
Drilled rivet locations with #40 drill.
Positioned and back drilled rear ribs and clecoed in place.
rear ribs clecoed in place
inner rear ribs
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CH750 Home
Category
# Logs
# Hours
All
158
275
Elevator
58
95
Empennage
58
95
Flaperons
3
4
Horizontal stabilize
16
21
Rudder
19
50
Slats
3
6
Tools
1
4
Copyright © 2001-2024 Matronics. All Rights Reserved.