KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
' style=
Date:  5-20-2023
Number of Hours:  5.00
Manual Reference:  FF3-1,2
Brief Description:  Engine controls

Temporarily installed engine control cables.
Located tunnel cover bracket as required for clearance and proper cable operation then drilled mounting holes.
Fabricated spacer for Aerosport throttle quadrant bracket and installed nutplates to tunnel cover for bracket attachment.
Checked and adjusted controls for full travel.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.