KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
' style=
Date:  5-21-2022
Number of Hours:  8.50
Manual Reference:  38-10, SB18-03-30
Brief Description:  Rudder cables, priming and panel work

Fabricated rudder pedal cable attach links per manual.
Primed links, elevator stops, and horizontal stab gap fairings.
Installed defrost fans.
Began installing avionics and electrical items to sub panel.
Installed control stick grips grounding block for pilot and copilot sides.
Installed Mcmaster Carr brake return springs on master cylinders.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.