KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
' style=
Date:  3-17-2021
Number of Hours:  2.00
Manual Reference:  38-3,4
Brief Description:  Rudder pedal torque tube installation

Installed fluid fitting elbows on all brake master cyliders.
Fabricated bearing blocks and match drilled to aircraft structure per plans.
Temporarily installed to check for fit. Assembly will need to be removed for interior painting.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.