KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
' style=
Date:  12-13-2020
Number of Hours:  3.00
Manual Reference:  37-2
Brief Description:  Andair fuel valve bracket modification

Fabricated doubler to allow andair fuel valve installation in original factory valve position.
Riveted doubler to existing bracket.
Installed nutplates on fuel valve mounting tabs then installed valve.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.