KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
' style=
Date:  7-21-2018
Number of Hours:  7.00
Manual Reference:  18-6,7
Brief Description:  Vent line fabrication and Qty Float Adjustment

Fabricated and installed vent lines into both tanks.
Installed vent line bulkhead unions in both tanks IB ribs.
Riveted both tank IB aft ribs in place.
Attached vent line to bulkhead flared fitting.
Final torqued vent line b-nuts to bulkhead fittings.
Temporarily fit and adjusted float arms on fuel qty sender units.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.