Brief Description: Priming and assembling attach brackets
Primed all exterior surfaces of all tank parts. Instead of fabricating patch plates, used AN470A-6 rivets to fill tooling holes in IB and OB ribs. Installed shims and nutplates as required on both tank attach brackets. Attached VA146 bearings to tank attach brackets. Attached fuel flange, anti-rotation plate and fuel sender nutplates to both IB ribs.