Temporarily installed horizontal with elevators and vertical stab. Trimmed and fit rubber seal to lower horizontal gap fairing. Clecoed gap fairing in place. Sanded areas of empennage fairing where attach screw holes are to be drilled to allow light to show through mounting locations. Using backlighting started drilling fairing from front to rear per plans. After drilling, removed fairing and trimmed as shown in plans.