KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
' style=
Date:  3-30-2017
Number of Hours:  3.00
Manual Reference:  10-9,10
Brief Description:  Installed longerons, aft deck and bellcrank ribs

Final drilled F1006 bulkhead to bellcrank ribs and baggage bulkhead channel.
Seperated, deburred and final drilled holes in elevator bellcrank rib angles.
Installed left and right longerons into bulkhead notches.
Placed spacer on top of horizontal stab attach angle and clecoed he f1014 aft deck in place.
' style=





' style=




' style=

Shear deck in place.

Shear deck in place.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.