KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
< Previous Log Entry          Next Log Entry >
' style=
Date:  3-18-2024
Number of Hours:  9.00
Manual Reference:  Ch.12, 20
Brief Description:  Fairings and interior install

Installed tail transition fairings.
Installed sealing boots on aileron fuselage control rods.
Connected fuel quantity wiring in wing root.
Installed previously wired center console with fuel selector valve mounting and checked for correct operation.
Installed panel air vents and scat hoses.
Began installing interior cockpit panels.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.