Brief Description: Aileron and flap attach and fuel tank cleaning
Installed previously rigged ailerons and flaps. Attached aileron and flap wing root pushrods. Checked for proper throw and clearance of all flight controls then saftied all hardware. Installed landing and taxi light in wing tips and checked operation. After installing wing root fuel feed lines added 5 gallons of avgas to tanks for final slosh cleaning and drained tanks.