Clecoed and match drilled both L and R firewall center rib assemblies with center angles, gussets and NLG tension fittings to firewall bulkhead. Installed and drilled heat duct tee flanges to center ribs. Installed and drilled fuel valve mounting bracket. Dissassembled, deburred and dimpled parts as required. Primed all parts.