KitLog pro

Powered By Kitlog Pro v2.0

RV-10 N73GF
' style=
Date:  5-12-2017
Number of Hours:  3.50
Manual Reference:  Modification
Brief Description:  VOR/LOC/GS Antenna and Doubler Fabrication

Fabricated antenna doubler from .040 and upper spacer from .051 sheet.
Match drilled doubler to upper vertical stab rib and drilled mounting holes for nutplates. Drilled center hole for coax attach.
Match drilled antenna spacer to rib.
Disassembled, de-burred, dimpled rib and doubler.
Primed all parts. installed #10 nutplates then riveted doubler to rib.
Riveted completed rib assembly to vertical stab skin and spar.
Temporarily installed antenna to check for proper fit and alignment.
' style=

Doubler and spacer fabrication

Doubler and spacer fabrication

' style=

Doubler installed

Doubler installed

' style=

Nav antenna installed

Nav antenna installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.