KitLog pro

Powered By Kitlog Pro v2.0

Greg's Bearhawk Build
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-4-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  rearranged the hangar

Moved some stuff around after uncrating the wings, added some electrical outlets, and concentrated the aircraft building tools and equipment over to one side of the hangar. Pulled a little plastic off one of the wings. I figure if I do that once in a while, eventually I'll have most of it off when I'm ready to start on the wings. I have no idea why they don't pull that plastic off at the plant.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2026 Matronics. All Rights Reserved.