KitLog pro

Powered By Kitlog Pro v2.0

Greg's Bearhawk Build
' style=
Date:  1-22-2017
Number of Hours:  7.00
Manual Reference:  
Brief Description:  vent line, brake lines

Put the vent line in from the header tank into the right wing root area. Not exactly sure how I'm going to tie that in there, but I'll figure it out. Completed the brake line install from the master resevoir through both brakes, through the parking brake. Ordered more line to complete down to the brakes. Installed all the cables from the cockpit to the tail.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.