KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  8-30-2008
Number of Hours:  12.50
Manual Reference:  
Brief Description:  Setup

There is a lot of time spent setting up of the Landing Gear. The Fuselage must be set level in all directions. The landing gear is setup by fixing it to the floor. To keep it all correct.

After setup the Landing gear sockets are bonded in with Redux to stop them moving. To add more stability the first rib is added.
' style=

Set Up

Set Up

' style=

Held in Place

Held in Place

' style=

First Rib

First Rib

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.