KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  6-15-2008
Number of Hours:  5.25
Manual Reference:  
Brief Description:  Prepared and bonded

Prepared and bonded the rear bulkhead in place. This is straightforward but time needs to be taken up in getting every thing in the correct position. I made a jig to get the rear bulkhead square with the fuselage, which was first set square.
' style=

Prepared For Bonding

Prepared For Bonding

' style=

Bonding

Bonding

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.