Got a Through a few jobs today. I first did the three ply's of bid over the STBD trim tab drive pin as I did with the PortI have also made the jig block for carrying the tailplane torque tube, this in ready for setting up of the tailplans on the tube.I filled the reuses in the T.E. of trim tabs to get the level for the flattener strips to be fixed. This has been filled with a dry micro, I will send them smooth when the micro had cured.