KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  3-12-2006
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Port layup nuderside

Today I did the bottom surface layup of the Port tailplane. as I did with the STBD side, Same procedure. I also removed the STBD tailplane from it's jig block and sanded the T.E. and their root, It looks really good.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.