KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  2-19-2006
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Flap hinges

Took longer than I expected today but I feel as though I have managed a lot. I removed the foam from the root and tip, then made the slots for where the 3 FL1,2, and 3 plates will fit. I hade to be really carefully In drilling out the center one in the rib, as not to go through the other side of the flap. After I setup the hinge plates in there slots to check everything is correct. Now on with the the root hinge first, also adding the FL7 plates, 3 of them, this is a hard point for the flap operation. A lot of fidely layup's here. first 2 ply's full length then hinge plate and 1 FL7 , another ply of bid then another FL7 plate, and again with the 3rd FL7 plate. To finish off another full length of bid. Keeping every thing straight with the jigs I made.I also did the tip close out the same way but without the FL7 plates. The center FL3 plate will be fitted later, lined up with string to get it in the middle
' style=

Bonded In

Bonded In

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.