KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  2-11-2006
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Flap Layup STBD

Today has been a difficult layup, I started out by preparing the Port Flap for the top skin. First I set up the Flap in its gig block, bonding it to the table with a torsion of 1.4o I apply the peal ply to the T.E. and to the tip and root. A "V" is cut out around the rib which is filled with flox before the Micro and Slurry. then two ply's of bid. Due to the size of the ailerons the cloth has to be put on in four pieces crossing the joints when the cloth is layed at 30o the other way. I did cut the cloth as described in the manual, but had problem with the length on laying the cloth so I got a bit of waste and had to cut some more cloth. All left to cure now It looks very good.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.