KitLog pro

Powered By Kitlog Pro v2.0

Construction Of the Europa XS
' style=
Date:  2-28-2006
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Washout

David came this evening and has now convinced me that the Washout is set correctly at 1.1o on the Ailerons, so I have spent time in getting everything ready for the first skin layup. I think I will do both together as the are both setup on the bench together.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.