Brief Description: Match Drilling the Vertical Stabilizer
Close up of the tip rib VS-706 all Cleco’d in and ready to match drill to #40.
The next step that the construction manual has you to do is drill all the holes in the VS-801PP skin. The rivets used to fasten the skin are AN426AD3-3.5 which called for the holes to be drilled to size 40.