KitLog pro

Powered By Kitlog Pro v2.0

Tim and Darren Aussie Web Site
' style=
Date:  5-12-2008
Number of Hours:  16.00
Manual Reference:  3.074 step 27-29
Brief Description:  Fuselage fairing installation

We marked the stabilizer chord reference line. The centre line of each strake must be aligned with the chord line of the stabilizer.The strake halves are then joined with masking tape and positioned correctly. Once satisfied the two halved are then joined with two layer of cloth and resin. To give the fairings strength strake ribs are inserted and using Q-cell they are bonded in place. Finally a sheet of cloth is resined on the top layer. A gap was left on the two outside ribs to allow any water that gets in to drain.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.