Powered By Kitlog Pro v2.0
Tim and Darren Aussie Web Site
Sportsman
Fuselage
12-6-2007
< Previous Log Entry
Next Log Entry >
Date:
12-6-2007
Number of Hours:
2.00
Manual Reference:
1.123: Step 69-72
Brief Description:
Drill the elevator bellcrank assembly
Elevator bellcank is assembled, holes drilled and rivetted. Installed the bellcrank and bracket assembly
Rivetting the elevator bellcrank assembly
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sportsman Home
Category
# Logs
# Hours
All
184
1500
Avionics
5
172
Engine
16
132
Final Assembly
79
721
Fuselage
40
219
Miscellaneous
3
7
Prop
1
12
System Installation
40
237
Copyright © 2001-2024 Matronics. All Rights Reserved.