Powered By Kitlog Pro v2.0
EAA279 Sonex Project
Sonex
All
2-17-2016
< Previous Log Entry
Next Log Entry >
Date:
2-17-2016
Number of Hours:
2.50
Manual Reference:
Brief Description:
Installed landing gear, and brakes
Install landing gear, and brakes, but had problems understanding how the brake lever would align to the brake cable bend. Placed the plane on the floor for fun, and went home to study the brakes.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Sonex Home
Category
# Logs
# Hours
All
228
750
Builders meeting
2
4
Empennage
16
52
Engine
8
24
Fuselage
79
274
Inventory
2
7
Miscellaneous
5
14
None
1
Shop space prep
8
22
Tail
20
64
Tools
1
4
Wings
86
285
Copyright © 2001-2024 Matronics. All Rights Reserved.