Powered By Kitlog Pro v2.0
Rans S-7S Courier
S7S
Wing LH
9-12-2009
< Previous Log Entry
Next Log Entry >
Date:
9-12-2009
Number of Hours:
8.00
Manual Reference:
05A-04
Brief Description:
Wing Frame Assembly
Started with the Lefthand Wing
The building of the LH Wing is almost a copy of the righthand wing exept for the Pitottube and Static system installation.
All parts deburred before installation.
Installed the inner and outer compression tubes.
Installed the aileron cable rub block and the aileron retention plate.
Installed the compression tube doubler in the compression tube.
Installed the flap and bell crank compression tubes.
Installed the jury strut bracket.
Assembled the teleflex retainer and the cable guide to the flap compression tube.
Installed the door up catch socket.
Installed the drag braces.
Installed the bell crank braces to the u-bracket.
Installed the tip bow.
Installed the nutplate for the aileron hinge bracket.
LH Bell Crank Brace
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S7S Home
Category
# Logs
# Hours
All
197
810
Control Systems
7
18
Covering
46
251
Delivery
4
21
Fuselage
21
45
Gear
3
4
LH Wing
11
42
Painting
50
235
Wing LH
11
42
Wing RH
22
76
Wings
22
76
Copyright © 2001-2024 Matronics. All Rights Reserved.