Rans S-7S Courier
S7S
Control Systems
11-11-2008
< Previous Log Entry
Next Log Entry >
Date:
11-11-2008
Number of Hours:
4.00
Manual Reference:
02-03
Brief Description:
Final Control Stick Assembly and Installation
Installed the torque tube in to the fuselage. Attached the control sticks to the torque tube.
Installed the linkage between the eyebolts in the aft stick and the push-pull tube.
Lots of time was used to sand and adjust the Pillow Blocks to make sure the torque tube moves without excessive friction.
Checked the entire Control Stick Torque Tube assembly for free movement and proper installation of hard ware.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S7S Home
Category
# Logs
# Hours
All
197
810
Control Systems
7
18
Covering
46
251
Delivery
4
21
Fuselage
21
45
Gear
3
4
LH Wing
11
42
Painting
50
235
Wing LH
11
42
Wing RH
22
76
Wings
22
76