KitLog pro

Powered By Kitlog Pro v2.0

Rans S-7S Courier
' style=
Date:  8-28-2009
Number of Hours:  2.00
Manual Reference:  05B-01
Brief Description:  Fueltank Assembly and Installation

Drilled and riveted a single-ear nut plate to the top of the S2-SAB bracket.

Installed the outer tank support.

Drilled two holes in the U- Bracket. Bolted the U-Bracket to the support tube and fastened the U-Bracket with two stainless steel rivets to the drag brace. Installed the 3/16" nut plate to the topside of the U-Bracket.
' style=





' style=

Righthand wingtank

Righthand wingtank

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.