KitLog pro

Powered By Kitlog Pro v2.0

Rans S-7S Courier
' style=
Date:  7-31-2008
Number of Hours:  5.00
Manual Reference:  01A-01
Brief Description:  Main Gear Fit Up

After the gear is placed in to the sockets one has to make a alignment jig to set the axles straight.

With the gear legs properly set one has to mark the gear legs by use of the pre-drilled hole in the fuselage socket, the gear legs must then be removed and finish drilling from each side in a drill press.

The gear will be installed after covering of the fuselage.
' style=

Alignment jig

Alignment jig

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.