Powered By Kitlog Pro v2.0
Rans S-7S Courier
S7S
All
7-28-2011
< Previous Log Entry
Next Log Entry >
Date:
7-28-2011
Number of Hours:
4.00
Manual Reference:
Brief Description:
RH Wing Second Coat of Polybrush
Cleaned the entire surface with C-2210 paint cleaning solvent before spraying the second
spray coat of Polybrush.
Spayed the second coat of Polybrush on both sides of the RH Wing.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S7S Home
Category
# Logs
# Hours
All
197
810
Control Systems
7
18
Covering
46
251
Delivery
4
21
Fuselage
21
45
Gear
3
4
LH Wing
11
42
Painting
50
235
Wing LH
11
42
Wing RH
22
76
Wings
22
76
Copyright © 2001-2024 Matronics. All Rights Reserved.