Powered By Kitlog Pro v2.0
Rans S-7S Courier
S7S
All
7-17-2011
< Previous Log Entry
Next Log Entry >
Date:
7-17-2011
Number of Hours:
8.00
Manual Reference:
07A-03
Brief Description:
RH Wing Inspection Rings
Glued the strut plate exits, jury strut exits. Layed out and bonded the inspection ring, flap teleflex exit and the aileron push pull tube exit.
Glued on the two drain grommets. Cut out fabric patches and glued over the corresponding parts.
Cut to lenght and glued the 2" Tapes over the ribs.
Next job will be to apply the 2" Tapes over the top-ribs etc.
Now finished for the day.
Inspection rings
2" Tape
Sealed with Polybrush
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S7S Home
Category
# Logs
# Hours
All
197
810
Control Systems
7
18
Covering
46
251
Delivery
4
21
Fuselage
21
45
Gear
3
4
LH Wing
11
42
Painting
50
235
Wing LH
11
42
Wing RH
22
76
Wings
22
76
Copyright © 2001-2024 Matronics. All Rights Reserved.