KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  12-29-2015
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Main bulkhead gussets

In preparatin for attaching the wings the main bulkhead to fuselage gussets were drilled to the fuselage and all holes deburred.

The hangar was reorganized to allow sufficient room for the plane to get its wings.

The remainder of the day was spent on the Decathlon. Having finally received the new wheels and brakes I mounted the tires and tubes onto the wheels. Next I constructed a clamp for the gear leg to provide a jack point to lift the tire and wheel off the ground.
' style=

Holes drilled in fuselage for gusset attach

Holes drilled in fuselage for gusset attach

' style=

Main bulkhead gussets after drilling

Main bulkhead gussets after drilling

' style=

Hangar rearranged

Hangar rearranged

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.