Powered By Kitlog Pro v2.0
Bills RV-7 Build Site
RV-7
Fuselage
12-9-2015
< Previous Log Entry
Next Log Entry >
Date:
12-9-2015
Number of Hours:
5.00
Manual Reference:
Brief Description:
Cowl, moldings, fairings
More fiberglass work today.
First I installed the last fuel line which I had just ordered, this one going from the fuel pump to the servo.
The joggle tabs for the front of the cowl were laid up.
The canope and top moldings were sanded and cleaned, then a past mix of micro was applied to fill holes and low spots.
The empennage fairing was brushed with a thinned coat of epoxy to fill pinholes.
Fuel line
Moldings
Joggle tabs
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
482
2070
Avionics
24
130
Electrical
12
68
Empennage
60
184
Engine
34
181
Fuselage
189
954
Landing gear
14
68
Miscellaneous
9
4
None
11
Service Bulletins
4
14
Shop Supplies
1
Tanks
31
115
Tools
2
Wings
91
352
Copyright © 2001-2024 Matronics. All Rights Reserved.