KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  8-13-2014
Number of Hours:  5.50
Manual Reference:  8-5
Brief Description:  Aft Fuselage

Work continued on the aft fuselage with drilling the J-Channel longerons. Unfortunately this included drilling onto one of my fingers as I was holding the channel behind the skin. Dumb! Though it bled impressively, a band-aid kept the wound in check until I got home.

I removed the tailcone skin and drilled the side skins to the J-Channel without the tailcone, hoping this woulod make it easier to fit the tailcone by using clecos. I really struggled with getting this part to fit and finally returned to the plans and discovered a fairly obscure drawing that indicated I did not heve the skins in the proper sequence, which was adding to my difficulties. I removed all celcos from the tail section and then re-clecoed with the tailcone skin underneath the side and bottom skins. Still not ready for drilling but I seem to ce closing in on it now.

I also marked and cut the opening for the tailwheel mount in the tailcone skin.
' style=

J-Channels drilled

J-Channels drilled

' style=

Tailwheel mount opening marked

Tailwheel mount opening marked

' style=

Opening cut

Opening cut

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.