KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  7-31-2014
Number of Hours:  7.00
Manual Reference:  8-2
Brief Description:  F704 Center section bulkhead

I made great strides today on prep work for the center section bulkhead. All pass through holes on the spar webs, bulkheads and cover support ribs were drilled out to the proper size for thei snap bushings. The parts were all clecoed together and match drilled. Web stiffener was drilled to the spar web. Cover support ribs were drilled anbd dimpled and platenuts were riveted to them. The top flange of ront and back spar carry throughs were drilled, countersunk and platenuts riveted. Control column mounts were drilled.

All parts are now ready for final assemble after I alodine the control column mounts, web stiffeners and spacer tubes.
' style=

Parts readied for assembly

Parts readied for assembly

' style=

Riveting platenuts for spar flange

Riveting platenuts for spar flange

' style=

Foreward bulkhead ready for riveting

Foreward bulkhead ready for riveting

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.