KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  6-22-2015
Number of Hours:  6.50
Manual Reference:  10-1
Brief Description:  Install landing gear

Today the plane came off of its cradles and was put on legs!!

I instaled the landing gear legs and then installed the wheels and tires. Drilling the holes for the cotter pin that keeps the axle nut in place was a bit of a challenge. As is the case with so many things, the second try took about a third of the time as the first and with a better result.

I put the plane on its gear now as I felt that it needed to be better supported when the engine arrives.
' style=

Using motor hoist to lift fuselage

Using motor hoist to lift fuselage

' style=

On gear

On gear

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.