KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  4-20-2015
Number of Hours:  4.50
Manual Reference:  
Brief Description:  PTT wiring, fuel pump wiring

Ran wiring for the PTT button on the pilot side control stick.

Attached connectors for the fuel pump wiring.

Tidied up and cable tied wiring bundles.
' style=

PTT wiring

PTT wiring

' style=

Connectors for fuel pump

Connectors for fuel pump

' style=

Sub-Panel layout

Sub-Panel layout

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.