KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  2-26-2016
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Paint cowl and fairings

I set up the paint booth again today and sprayed the top coat of paint on the wheel, intersection and leg fairings, the spinner and the two cowl halves. Once everything was dry to the touch I dismantled the booth and returned the Decathlon to the hangar.
' style=

Cowl painted

Cowl painted

' style=

Fairings painted

Fairings painted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.