KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  2-25-2016
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Prime cowling and farings

Today I moved the Decathlon outside and set up my temporary paint booth. I spray primed the landing gear fairings, wheel fairings, intersection fairings, spinner and the cowling halves. After allowing the paint to dry to the touch the paint booth was disassembled and the Decathlon moved back inside.

Inspection covers at the rear fuselage at the elevator horn area were installed.
' style=

Paint booth

Paint booth

' style=

Fairings

Fairings

' style=

Cowling

Cowling

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.