KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  12-15-2015
Number of Hours:  7.50
Manual Reference:  
Brief Description:  Prime and paint moldings and empennage fairings

We had a beautiful warm day today, which was perfect for the tasks to be completed.

First order of busiess was to sand the exoxy dress coat I applied to the trailing edge of the top molding. Next I did a final sanding of the empennage fairings and the wing tips, which need another coat of paint.

The Decathlon was rolled out of the hangar and I set up my portable paint booth. Fisrt I primed the empennage fairings, then moved the booth and primed the canopy base and top moldings.

When the primer dried to the touch I noticed some pinholes so used thick primer on the holes, then resanded when dry.

The canopy moldings were final coat painted, then the booth moved back t the center of the hangar and the empennage fairings and the wing tips were final coated with paint.

While everything dried I spent a few hours cleaning up in the hangar. When sufficiently dry the masking tapes and parer were removed from the fuselage.
' style=

Moldings painted

Moldings painted

' style=

Painted empennage fairing placed into position

Painted empennage fairing placed into position

' style=

Completed canopy moldings

Completed canopy moldings

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.