KitLog pro

Powered By Kitlog Pro v2.0

Bills RV-7 Build Site
' style=
Date:  12-11-2015
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Fiberglass, doghouse

Fiberglass work continued. The canopy moldings were sanded and then micro paste used to fill remaining low spots. When cured these spots were sanded down and a final coat of epoxy applied.

I fabricated a little piece of angle to attach the the rear of the side skirt on the canopy to act as a hand hold for opening the canopy.

The doghouse was riveted to the canopy frame and rear skirts.

I attempted to build up one edge of the top cowl wehre I oversanded. Hopefully this will work.
' style=

Canopy moldings

Canopy moldings

' style=

canopy open assist

canopy open assist

' style=

Doghouse

Doghouse

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.